Components
| COMPONENT 1 | Analysis and assessment of the administrative capacity to implement the environmental legislation for local authorities; Links with central and regional level |
|---|---|
| Specific Objectives |
|
|
Task 1 Legal Study |
Study of the existing environmental legislation at local level. Analysis of the compliance of local regulations with the national environmental legislation in particular focusing on the compliance of the municipal environmental strategies and programs with the requirements of the national legislation and EU programming documents; based on legislative, strategic and programming documents produced by the municipalities. |
|
Task 2 Administrative Study |
Study of the existing administrative structure, responsibilities, hierarchy for environmental management at national, regional and local levels and their links. Analyse and assess the level of compliance of the structures in comparison with their obligations and responsibilities to implement the environmental legislation. Identify gaps and compare to practice and experience in EU member states. |
|
Task 3 Information Flow Study |
Study the information flow between national and local authorities and among the municipalities. Assess and identify the main gaps of the information flow. Develop an applicable Environmental Information System (EIS). Propose, provide and adopt appropriate software solution for making EMS operational, based on existing information system and compatible with the available products at the beneficiaries’ administration. |
|
Task 4 Organizational Study |
Study the capacity of the municipalities for implementation of the environmental legislative requirements. Carry out separate analyses and assessments of the existing internal municipal administrative organisations of the 3 pilot municipalities. Identify capacity gaps of the municipalities to implement the environmental legal requirements. Develop proposals for changes and amendments to optimize the structures covering all municipal environmental obligations. Describe an alternative structure for supporting environmental issues in smaller municipalities. |
|
Task 5 Human Resources Study |
Carry out detailed study of the number of people (staff), qualifications and experience of the municipal units dealing with environmental issues in the 3 pilot municipalities. Develop and distribute a questionnaire for the remaining municipalities. Collect and analyse questionnaires. Analyse the results of both the detailed study and the questionnaires. Identify the needs for additional staff and all types of training. |
|
Task 6 Technical Infrastructure Assessment |
Review the needs assessment prepared by the Beneficiaries for office equipment in the municipal environmental sector. Prepare a long list of equipment needed and a list of the most urgent needs. |
|
Task 7 BAMEE Study |
Analyse the place and role of BAMEE in the process of implementation of environmental legislation for strengthening its capacity as a partner of the MoEW in the implementation of the environmental legislation at local level. Review and assess the current status of BAMEE. Study the needs for office equipment of BAMEE. |
|
Task 8 Reporting |
Draft Administrative Capacity Report. |
| COMPONENT 2 | Strategy and implementation programme for strengthening the administrative capacity to implement the environmental legislation for local authorities |
|---|---|
| Specific Objectives |
|
|
Task 1 Legal Implementation Timetable |
Prepare proposals for the improvement of local regulations, administrative orders, instructions and other legislative documents issued by the municipalities for achieving full compliance with national legislation and EU requirements. Identify bodies responsible for implementation. Prepare potential timetable for implementation. Prepare a proposal for the improvement of the process for strategy development and programming for development of realistic programs and investment plans for improvement, protection and management of the environment. |
|
Task 2 Administrative Implementation Timetable |
Identify responsible bodies and authorities and assess their necessary financial and human resources and identification of potential financial sources. Developing a timetable for the implementation of changes agreed with the interested parties of the administrative structure. |
|
Task 3 Organisational Implementation Plan |
Develop a Plan for the implementation of the agreed organisational changes. Describe a new structure/system to support the administration of small municipalities. |
|
Task 4 Municipal Human Resources Plan |
Assess the need for appointment of additional staff for the purposes of environmental management at local level. Identify the needs for ordinary and specific training for existing and new staff and development of for ordinary and specific training. Develop a potential timetable for the implementation of the training. Prepare a proposal for Staffing Standards for Personnel in Municipalities (SSPM) in the environment sector. Assess and identify potential financial sources for appointment and maintenance of the new staff and implementation of the training programs. Study the possibilities of using EU and other donor funds and outline the main donor’s funding requirements. Draft a Municipal Human Resource Development Plan. |
|
Task 5 Technical Infrastructure Implementation Timetable |
Analyse the proposed list of municipal needs for electronic equipment. Study and assess all potential financial sources for supply of equipment. Develop an implementation time table taking into account the prioritization and the funding possibilities. |
|
Task 6 BAMEE Sustainable Development Plan |
Study the possibilities to use donor funding as a co-finance source for establishment and functioning of BAMEE or similar structures. Draft a Sustainable Development Plan for BAMEE. |
|
Task 7 EU Professional Organisations Study |
Assess relevant EU professional organizations in the field of environmental protection. Prepare a list of relevant EU professional organizations in the field of environmental protection. Support the establishment and further development of relationship between BAMEE and selected organization. Organize a study tour in the country of the selected EU professional organization. |
| COMPONENT 3.1 |
IMPLEMENTATION MEASURES Programming Improvement Actions |
|---|---|
| Specific Objectives |
|
|
Task 1 Municipal Programming & Planning Process |
Assess the existing programming and planning process at municipal level of the selected pilot municipality. Assess one existing pilot municipal environmental program/strategy and corresponding investment plan. Identify gaps in the program development process at local level. Analyse the challenges which municipalities are facing in the planning process with the introduction of the fiscal decentralization in Bulgaria. Update the pilot environmental program. |
|
Task 2 Methodology Guide |
Develop a Methodology Guide for preparation, implementation and monitoring of Local/Regional environmental investment programs. |
| COMPONENT 3.2 |
IMPLEMENTATION MEASURES Human Resource Development Actions |
|---|---|
| Specific Objectives |
|
|
Task 1 Training Needs Assessment |
Assess training needs for trainers and staff in municipalities focusing on:
Prepare needs assessment report. |
|
Task 2 HRD Plan |
Prepare a Human Resources Development Plan for experts involved in implementing the environmental requirements, at local and regional level. |
| COMPONENT 3.3 |
IMPLEMENTATION MEASURES Establishment of Centre for Consultancy, Information and Specific Environmental Training, based on BAMEE |
|---|---|
| Specific Objectives |
|
|
Task 1 Review Legal Options |
Review and assess the legal options for establishing and registering the Centre. Review and assess the financial options for establishing and registering the Centre. Prepare separate report on potential financial sources and main donors requirements. Review and assess the different legal and financial options for establishing the Centre. Draft a proposal of the chosen option and assist with the preparation of the necessary legal documents for registration of the Centre. Propose changes or amendments of the structure of BAMEE. |
|
Task 2 Centre Curricula |
Identify the type of training most relevant to the Centre. Analyse the activities of the National Institute for Public Administration and EU Integration. Draft Centre Curricula. |
|
Task 3 Training Plan Elaboration |
Define the target groups for specific training focusing on investment planning, project preparation and implementation. Elaborate draft training programs focusing on programming and planning skills at local level. Coordinate the programs with relevant institutions and organizations. Prepare formal training programmes fiches for every training programme, taking into consideration relevant EU experience. |
|
Task 4 Training of Trainers |
Develop training for trainers programs on the basis of EU best practices. Develop expert selection criteria. |
|
Task 5 Training Implementation |
Organize and implement one training course for approximately 30 trainees from members of BAMEE and experts from MoEW and REI. Implement day to day training for the members of BAMEE. Performing an ex ante, on going and ex post evaluation of every training programme Issuing of Seminar Reports. |
|
Task 6 Training Manual |
Develop Training Materials and Manual |
|
Task 7 Develop Training Materials |
Organize and implement one training cource for approximately 30 Trainers from members of BAMEE and experts from MoEW and REI. Implement day to day training for the members of BAMEE |
| COMPONENT 3.4 |
IMPLEMENTATION MEASURES Pilot Information System Establishment and Technical Infrastructure Improvement |
|---|---|
| Specific Objectives |
|
|
Task 1 Pilot Information System |
If need be the Consultant will assist the Beneficiaries in the tendering process. Establish and test the information flow system covering the chosen 26 pilot municipalities, BAMEE and MoEW. |
| COMPONENT 4 | Public Awareness |
|---|---|
| Specific Objectives |
|
|
Task 1 Public Awareness Campaign |
Design and implementation of Public Awareness Campaign. Produce chapter describing what environmental services municipalities are obliged to offer to the population. Issue and publish 1600 brochures in English and Bulgarian presenting the main results of the project. Distribute brochures among the interested parties (municipalities, state institution and their regional bodies, environmental NGOs, donors, etc). |
| COMPONENT 5 | Dissemination of Results |
|---|---|
| Specific Objectives |
|
|
Task 1 Dissemination |
Publish and distribute to all parties concerned in Bulgarian the following documents produced by the Project:
Organise 6 one-day seminars for the all six regions to inform the interested parties about the main results achieved by the project. |